SGS/FM/ISO9001/ISO14001 approved pharmaceutical engineering clean room Z ceiling

Wiskind company specializing in R & D, manufacturing and sales of cleanroom system, ceiling system, all kinds of doors and windows and related equipment. Base on more than 40 years of R & D experience, Wiskind cleanroom system is supplied in the fields of electronic semiconductors, biopharmaceutical, food and m

Featured Products

Wiskind company specializing in R & D, manufacturing and sales of cleanroom system, ceiling system, all kinds of doors and windows and related equipment.

Base on more than 40 years of R & D experience, Wiskind cleanroom system is supplied in the fields of electronic semiconductors, biopharmaceutical, food and medicine, aerospace and scientific research, chemical industry and new energy. 


                   
                   
Cleanroom Wall System/Ceiling System
Cleanroom modular sandwich wall panel system. The wall panel system is made up of aluminum profiles, various surface steel, and different core materials.

 Handmade panel parameters
 
Standard Width980mm,1180mm
Max Length7500mm
Wall thickness50mm,75mm,100mm,150mm
Steel Thickness0.4-0.8mm
Outer plate materialPPGI,Al-mg-Mn Alloy steel,SS steel,Ti-Zn steel,HPL,VCM
CoatingPE,PVDF,HDP
Core materialPU,rock wool,magnesium board,paper honeycomb,aluminium honeycomb,plaster,EPS, etc.
Frame Thickness0.6-0.8mm

Application
Pharmaceutical Cleanroom, Electronic Cleanroom, Food Cleanroom, etc.
SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering

Advantage:
  1. Core material fire ratings can be viewed.
  2. The cleanroom wall panel system is connected by aluminum profiles, modular installation, convenient and fast, non-standard can be customized.
  3. Factory  customization.
  4. Diversified core material for different environments, fire protection, thermal insulation, noise reduction, moisture resistance.
  5. The factory provides customers with 6 different kinds of steel and more services.
  6. The cleanroom wall panel, strength, flatness, and aesthetics of the panel are greatly improved, and the product quality is more stable.
  7. The hole reinforcement reservation and the line pipeline box are pre-assembled into the interior of the board in the factory, effectively reducing the secondary pollution during use, especially in the operating room.
       SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering

              
Production Technology:
  1. Specialized laboratory for testing the raw material and the finished products.
    1. Self-developed World's No.1 Automatic production line for cleanroom wall partition systems.
      SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering
    2. High-efficiency production line increases production capacity by 6 to 8 times.
      SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering
       
    3. Accurately measure and control sheet metal forming, gluing, core filling, composite molding and finished palletizing.
    4. SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical EngineeringF
    Wiskind Factory:
    Office building:
    SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering


    Workshops:
    SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering

    FAQ:

    1.Are you a Factory/Manufacturer or Trading Company?
    We are a manufacturer with 40 years experience of production and have a modern standard plant of 1,000,000 m².

    2.How about your lead time?
    It will take 3-7 days for budget and design according to the drawings after receiving the deposit.  15-30 days if there are some special sizes.

    3.Can you sell products to all over the world?
    Yes, we have 4 subsidiaries, 13 offices and more than 100 technical superviors all over the world, providing timely and face-to-face service for customers.

    4.How about your core competitiveness?
    We have the first automatic production line in the world. Compared with the traditional manual production line, the production efficiency increased by 6-8 times, leading most competitors. That means lower cost and higher quality.

    5.Do you have your own construction team?
    No, but all of our cleanroom panels and connected parts are easy for disassemble and installation due to our excellent design. What's more, we provided the instruction and videos for installation and we can send our professional superviors to the site.

    6.How many kinds products do you have?
    At present, we have more than 30 different products, including clean room wall panel system, ceiling system, clean room door, clean room window and so on.

    7.Can you provide samples? Is it free or extra?
    Yes, we can provide samples for free, but we would appreciate it if freight to collect.

    8.What is your terms of payment ?
    30% T/T prepay, 70% T/T before delivery. We can discuss payment if we have more cooperation in the future.

    SGS/FM/ISO9001/ISO14001 Approved Clean Room Z-Ceiling Panel of Pharmaceutical Engineering
     
    Welcome to wiskind, we will be your trustworth partner!
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours